CCR REPURPOSING SITE

building-structure-typeCCR

globe-2Indiana

clock-of-circular-shape-at-two-o-clock_318-48022October 2016 – Ongoing

tag$30 M

trophy_iconZero OSHA Recordables

icon-person-128CONFIDENTIAL

NorthStar was contracted to repurpose an existing CCR impoundment for new stormwater collection and retention system; dewatering of basin and CCR prior to removal; excavate 600,000 cy of CCR and subgrade; hauling and placement of removed material into an on-site landfill;  excavation and development of on-site borrow souce; backfill; construction of berms and cells; installation of liner system and cover for basins; and, demolition and reconstruction of a drainage ditch to serve as the influent source to the settling basin.