FORMER MANUFACTURED GAS PLANT ISS

building-structure-typeExcavation and In-Situ Stabilization (ISS)

globe-2Camden, New Jersey

clock-of-circular-shape-at-two-o-clock_318-48022June 2013 – February 2014

tag$10.3 M

trophy_iconZero OSHA Recordables

icon-person-128PSEG

 

NorthStar was retained to perform an in-situ stabilization (ISS) project starting in the summer of 2011 at this former Manufactured Gas Plant Site located in Camden, New Jersey. This project was time-critical for the client as there was a new substation planned to be constructed on this property starting in the spring of 2012. The project included preliminary demolition activities, followed by excavation and off-site disposal of nearly 50,000 tons of soil to specified depths, and then included ISS treatment of over 24,000 cubic yards (CY) of soils using an excavator mixing method.