FORMER MANUFACTURED GAS PLANT ISS
Excavation and In-Situ Stabilization (ISS)
Camden, New Jersey
June 2013 – February 2014
$10.3 M
Zero OSHA Recordables
PSEG
NorthStar was retained to perform an in-situ stabilization (ISS) project starting in the summer of 2011 at this former Manufactured Gas Plant Site located in Camden, New Jersey. This project was time-critical for the client as there was a new substation planned to be constructed on this property starting in the spring of 2012. The project included preliminary demolition activities, followed by excavation and off-site disposal of nearly 50,000 tons of soil to specified depths, and then included ISS treatment of over 24,000 cubic yards (CY) of soils using an excavator mixing method.